Got our call today (1/18/21) that the RV is in and will be ready for pickup in 4 days. We ordered the unit in mid-October 2020 that was already in the dealer pipeline since May but had yet to be purchased. It had a build start date of 12/16/20. We were able to change the exterior color, counter top color, and add the exterior table to the order since the build start was still >6 weeks out.After a lot of searching and phone calls we found a Unity 24MB in October that the dealer had on allocation and had been "configured" in May. The dealer told us the build start date was mid-December with a projected ship date of late February. The options/upgrades selected by the dealer were very close to what we wanted. We were able to make decor color changes since we were still inside the factory permitted change window. Overall we feel quite fortunate to have found a unit that we could get exactly the way we wanted it and will only have to wait 5 - 6 months. We signed up for a "myLTV" account based on our Purchase Order number and were able to confirm the build start date with the factory.
Congratulations! Your time from order to delivery sounds like it will be inside one year! Which dealer did you order for??Got my call yesterday, Unity RL delivered to dealer 1/12/21.... Looking to pick up in the next 2 weeks. Placed order early March 2020
Congratulations! So exciting. Where is the first trip planned?Got our call today (1/18/21) that the RV is in and will be ready for pickup in 4 days. We ordered the unit in mid-October 2020 that was already in the dealer pipeline since May but had yet to be purchased. It had a build start date of 12/16/20. We were able to change the exterior color, counter top color, and add the exterior table to the order since the build start was still >6 weeks out.
The unit ended up being manufactured earlier than 12/16 as it was already completed by 12/22 with the exception of the awning being installed. We were just glad that the earlier production date did not affect us getting the changes we had requested.
We ordered/purchased our unit from Schaap's RV Traveland in Sioux Falls, SD. They had the unit as part of their allocation and was in the queue and pre configured by them. When we put our deposit down on it in October we were able to make the color changes we wanted since it was still 6+ weeks out from production. We took delivery on February 12th and drove it back to NorCal.Congratulations! Your time from order to delivery sounds like it will be inside one year! Which dealer did you order for??